Budget at completion (BAC) is the total authorized budget assigned to complete a defined scope of work. At the total project or contract level, BAC generally represents the Performance Measurement
All DoD Program Execution
Explore all articles

Budget at completion (BAC) is the total authorized budget assigned to complete a defined scope of work. At the total project or contract level, BAC generally represents the Performance Measurement
The Integrated Master Schedule (IMS) supports an Earned Value Management System (EVMS) by defining when authorized work will occur, connecting that work through schedule logic and providing the status and
IMS critical path analysis identifies the sequence of remaining activities that drives a program completion date or another key milestone. To perform it correctly, update the Integrated Master Schedule (IMS)
A near critical path schedule review identifies sequences of work that could soon control a program completion date or key milestone. These paths have more total float than the current
The critical path method is a network-based scheduling technique that calculates the sequence of activities controlling a project or milestone finish date. It gives the program team a forecast based
Total float is the amount of working time an activity can be delayed without delaying the project finish date or another controlling schedule milestone. It measures schedule flexibility relative to
Negative float is the amount of time by which a schedule’s calculated completion date exceeds a required or targeted date. If an activity has negative 10 days of total float,
Free float measures how long an activity can slip without delaying an immediate successor. Total float measures how long it can slip without delaying the project finish or another controlling
A driving predecessor is an immediate predecessor that currently determines the start or finish date of its successor through schedule logic. If the driving predecessor moves later, the successor will
The difference between hard vs soft constraints is how severely each one restricts a schedule’s response to network logic. In a forward-scheduled network, a soft constraint prevents an activity from